Apex Construction
SIPS panel garden room build in Wiltshire
§ Service 08 / 08

SIPS Buildings in Wiltshire & Somerset.

Structural Insulated Panels — engineered panels manufactured off-site, delivered as a flat-pack and erected in days. Faster than traditional masonry, far more thermally efficient, and increasingly the smart choice for garden rooms, extensions and new builds.

Typical timeframe2–10 weeks
U-values0.10–0.16 W/m²K
QuotesFixed price, written
Starts from£24,000
§ Overview

A flat-pack building, engineered to last 60+ years.

SIPS — Structural Insulated Panels — are factory-made sandwich panels: two skins of OSB (oriented strand board) bonded to a thick rigid foam core. Each panel is structural in its own right; you don't need a timber frame behind it. The panels arrive on site cut to size, weather-sealed and labelled, and you essentially assemble the shell of a building like flat-pack furniture.

It's not new technology — SIPS have been used in North America for 40+ years and across Scandinavia and Germany for longer — but UK adoption has accelerated as Building Regs U-value requirements have tightened.

Why faster, why warmer.

Faster build

Most of the work happens in the factory. On site, a small team can erect the shell of a 30m² garden room in 4–5 days from a prepared foundation. A two-storey extension shell goes up in 8–12 days. By comparison, traditional brick-and-block takes 3–4× longer at the shell stage because every brick has to be laid wet, in suitable weather.

Better thermally

The continuous foam core eliminates the cold bridges that plague timber-frame and masonry construction. Real-world U-values of 0.10–0.16 W/m²K are achievable without crazy thickness. You can hit Passivhaus standards in 200–250mm panels.

Better airtightness

Factory tolerances are tighter than on-site bricklaying. Joints between panels are taped and foamed during assembly. Air-pressure tests of 1.5–2.0 air-changes-per-hour are routine — far below the 5.0 minimum that traditional builds often miss.

Less weight on foundations

SIPS weigh about 30% of equivalent masonry. Foundations can sometimes be lighter (raft instead of strip). Particularly useful for two-storey extensions on tight sites.

What we use SIPS for.

Garden rooms

The most common use. Office, gym, studio, music room, hot-tub house. Often qualify as outbuildings under permitted development. Typical 20–30m² build: 4–6 weeks total from groundworks to handover.

Extensions

SIPS extensions can be clad to match the existing house externally — brick, render, timber, even stone — so they look traditional from the street while delivering modern thermal performance. Particularly cost-effective for two-storey extensions.

Loft conversions (replacement roofs)

SIPS roof panels are increasingly used for full mansard/loft conversions — the roof is replaced in days, not weeks, and the thermal performance is significantly better than insulating between rafters.

Small new builds

One- and two-storey new houses. Faster on site, easier for self-builders, hits modern energy standards comfortably. Most often combined with traditional foundations and roof tiling so it looks no different from any other house.

Recent SIPS projects.

SIPS garden room Bath
Garden room · Bath

Larkhall · 24m² studio

SIPS garden room with cedar cladding, bi-fold doors, fully wired for office use. Shell up in 4 days.

5 wks total£32k
SIPS extension Trowbridge
Extension · Trowbridge

Wingfield · 38m² rear

Single-storey rear extension in SIPS, brick-clad to match the original 1930s semi.

9 wks£64k
SIPS new build Frome
New build · Frome

Marston Lane · 95m² self-build

Two-bed bungalow, full SIPS shell in 9 days. Owner-managed second-fix.

16 wksPOA

FAQs.

What is a SIPS building? +

SIPS = Structural Insulated Panels. Each panel is a sandwich of two OSB skins around a thick rigid foam core (typically 100–200mm). The panel is structural — no timber frame needed. They're manufactured to size, delivered as a flat-pack, and erected fast.

How much faster is a SIPS build? +

30–50% faster on the shell stage versus traditional masonry. A typical 30m² garden room is weather-tight in 4–5 days from foundation. SIPS extensions or two-storey new builds typically save 4–6 weeks overall.

Are they warmer than traditional? +

Yes — significantly. SIPS achieve U-values of 0.16–0.10 W/m²K easily. Continuous insulation eliminates cold bridges, airtight construction means much less heat loss. Real-world bills are typically 30–50% lower than equivalent traditional builds.

Do I need planning permission for a SIPS garden room? +

Most SIPS garden rooms qualify as outbuildings under PD — under 2.5m at the eaves (within 2m of a boundary), under 4m max height, and not covering more than 50% of the garden. Habitable use as bedroom/annexe triggers stricter rules.

Can SIPS be used for full house extensions? +

Yes — increasingly common. A SIPS extension can be clad in any material (brick, render, timber, stone) so externally it matches the existing house. Faster build, better thermal performance, particularly suited to two-storey extensions.

§ Related work

Often combined with…

Curious about SIPS?

Free site visit. We'll tell you if it's the right fit.

SIPS is excellent for some projects and overkill for others. Honest answer at the quote stage.

Call usGet a quote